Should unnecessary roadworks be postponed until people are no longer stuck inside?
I don't mean gas works, or works connected to other essential things such as water, electricity, internet, phone or whatever.
I mean for example creating a cycle lane or changing a road that had been the same for decades.
My opinion is that they should wait until the lockdown is over. I feel that people are already stressed and fearful, and noise is a form of torture.
Please add your views. Thanks.