We are having some work done on our bathroom, namely having the bath rehung (is very wonky water depth varies by about 10cm depending which end you sit at!) walls retiled, a new toilet fitted, new flooring and the sink rehung (everything slides off into the sink at the mo)
So what do we do first? Bath and tiling, then sink toilet and leave floor to last, or floor first? Am very confused by it all...