I’m posting this in the hope that others can learn from my mistake.
I appointed Resi to provide architect and design services for me on a loft and kitchen extension. Their work was poor and cost me c£3k to put right. During the design phase I raised various concerns about the person working on my designs (who I had thought was an architect but was revealed not to be during the course of my complaints - to be fair to Resi they didn’t ever say he was an architect, I had just assumed that when you ask an architects firm to design your extension you get an architect, but apparently not). At the time Resi appeared to have taken these seriously and assured me that the designs had been reviewed by a senior member of staff and that they were the best possible designs for the space. However once they were built there were clearly some flaws with them that had not been discussed with me. A friend and I (who have no design training) were able to see how moving some internal walls and entrances to rooms could dramatically improve the space and get rid of the shortcomings. The builders were able to implement these and agreed this was a much better design.
When I formally complained to Resi their response was defensive and dismissive. It was only once I left a negative review that they took my complaint seriously. Even then their responses are inconsistent and inadequate. Some of their staff have acknowledged that my amended design is much better, but their formal review of the design was just passed back to the person who originally reviewed it and said it was the best design, and his response has been defensive focussing on pointing out non-existent benefits to the original design.
There were other issues with Resi too. I asked them for support with a few technical things which they ignored. They were unable to give any analysis or insight about local planning guidance and just quoted the guidance back to me rather than bringing any wisdom. They were extremely conservative & unambitious in their designs although ultimately I pushed them for something more which was approved at planning without comment or amendments. The contractors they recommended were massively more expensive than locally recommended contractors that I was able to source, in one case more than double the tender price, so maybe someone was expecting a kick back?
I would neither use Resi again, nor recommend them to anyone else. It feels like the good end result I have got for my extensions is in spite of Resi rather than because of them.