We’ve recently bought a Victorian house that needs a fair bit of work, and I’m trying to work out the best way to approach it.
There’s a mixture of jobs: plastering around the house, some joinery/banister work, a new bathroom, radiator replacements/repositioning and some electrical work. There’s also a kitchen renovation, although I may leave that until later.
It’s the mix of work that I’m struggling to work out how best to organise. For example, would the bathroom normally be handled by a dedicated bathroom fitter, while other jobs go to individual trades, or does it make more sense to have a general builder/small multi-trade firm coordinate everything?
Some of the quotes I’ve had are already quite substantial for labour alone, before materials, so I’m wondering whether I’m approaching this in the right way.
For those who have taken on similar work, how would you approach it? Would you use one builder, a smaller multi-trade firm, individual trades, or a combination — and would you tackle everything together or split it into stages?
Just to clarify, there will be various works throughout the house, but I’m not gutting the property or changing the existing layout — there’s no knocking through walls, extension or major structural work involved.