Following on from my thread about renovating a 1930's semi, I was trying to work out the order in which the jobs should be done.
My thoughts were:
Soundproofing party wall
Full rewire, re-insulation and boarding of loft, gutter cleaning all at the same time.
Followed by simultaneous kitchen and bathroom renovation.
Redecorate
Carpentry (fitted book shelves)
Flooring
Does this seem sensible?