Hi all,
Had my bathroom refurbed a few weeks ago and while I'm delighted with how it looks, the guy is coming back in to do some snagging this week. Are these legitimate things to raise with him or are some of them to be expected i.e. not problematic?
It's last two in particular I'm not sure if that's just normal?
- Leaking basin
- No trim around basin splash back
- Removal of leftover materials from house
- Step into bathroom was adjusted but has a bare strip now which needs to be covered
- shower rail isn’t sealed where it comes in through the tile, so water is getting into wall
- Set of lights by washer/dryer aren’t properly fixed to the ceiling but are hanging off at one end
- Shower tray is moving under pressure and I can hear air being forced out
- Toilet is moving and rocking - doesn’t appear secured to floor