Is this quote reasonable?

7 replies

LoveGigi · 19/09/2016 21:38

We are near the end of a bathroom refurb which has been part DIY, part professional job. Long story. Anyway we are at the tiling stage and am getting quotes for the final fix. I need a plumber to fit the sink and connect up the waste and taps, lay the shower tray and connect up the waste. For shower door and panel. Install the shower valves. Install the cistern and pan, connect up the bath. Connect up the towel rad. All the pipes and waste are in place. I've been quoted between £550 and £650. I think this is a 1 full day job possible going over into a second day. What do you think re cost?

OP posts:
umizoomi · 19/09/2016 21:41

At least £300 per day for a plumber - my bathroom took 5.5 days to do and the labour charge was £1800 so it's probably a little high but I guess he has quoted for it being more than one day?

Shadowboy · 19/09/2016 21:45

Hmm tricky my husband did all of ours but most tradesmen charge about £200 onwards a day so how many days work is it? If it's 2-2.5 days then sounds about right.

LoveGigi · 19/09/2016 21:55

Thanks for your replies. As I've already paid for 5 days of plumbing at £200 a day I was just shocked to think it would cost a further £550-£650 to finish it when on the face of it there doesn't seem too much left to do, I'm obviously not a plumber but I'm so wary of being ripped off. The plumber that we got this quote from works with the tiler so he can pop in to connect the shower after the floor is screeded so that the floor tiles can then be laid. Then once the tiling is done the plumber will come and do the final fix. He said it's possibly a 2 day job. Yes he will need to come here on 2 separate days but there isn't 2 full days of work left.

OP posts:
didireallysaythat · 19/09/2016 22:22

I'd guess 2+ days ? The towel rad will require the entire system to be repressurised ?

Pradaqueen · 21/09/2016 05:02

I'd say about right for the work you stated but obvs we don't know what you asked for or got for the other 5 days work? Will he mastic the bathroom after fitting or will you require another person to do that?

notmyfirst · 21/09/2016 11:17

Sounds about right to me.

LoveGigi · 21/09/2016 13:08

Okay that's all good, I'm just never keen to go ahead without getting more than one quote.

OP posts: