6 replies

MrsCampbellBlack · 04/11/2015 09:45

Tiling and then fitting of loo etc? Just wondering as have dates for my tiler to come and wondering what needs to happen in which order.

I know I can ask my plumber/builder but at work so thought I'd ask here first - thanks!

OP posts:
bonzo77 · 04/11/2015 09:59

Tiling first. Otherwise tiler has to tile around things which is harder. And leads to problems like not being able to remove cistern lids or open doors . Also if in the future you need to replace something it's much easier.

MrsCampbellBlack · 04/11/2015 10:15

Thanks bonzo! I was hoping that was the case as tiler is booked for 23rd November and my basin hasn't arrived yet.

OP posts:
DoctorFunkenstein · 04/11/2015 10:17

Uhh - correct in terms of basin and sink. Tile first then fit.

You will need to fit the bath to the wall before you tile around that.

MrsCampbellBlack · 04/11/2015 10:42

Sorry - should have said - it is a wetroom so no bath just shower, loo and basin.

OP posts:
DoctorFunkenstein · 04/11/2015 10:50

Technically I'm not sure - it would depend on whether you are having a shower enclosure or not? I think in the same manner as a bath you would have to install the tray first and tile down to it, then install the doors etc.

If no enclosure you are fine to tile everything first.

MrsCampbellBlack · 04/11/2015 10:57

There isn't a shower enclosure so hopefully timings should work. Who knew there would be a 4-5 week lead time on getting a basin and stand delivered Wink