Our bathroom needs to be replaced.
I’m of the opinion that we should do it in bits- sink and toilet ( which we’ve already purchased) done one day and then get the bath tub done another day or 2. Then tiling separately.
The tradespeople who do the tiling will be different anyway.
I really want to minimise the possibility of not having bathing facilities for a while. We’ve teen DC
DH wants it all done in one go and says we’ll manage with downstairs WC