I’ve had a whole new media wall put in by a joiner however I was quoted extra for lighting which was about £150-£200 for materials and as an electrician would be doing it, it would be £350 extra all in.
However the joiner did it himself and still wants the full extra £350 but I’m of the mindset that I’m already paying him a daily rate so why would I pay the full £350 when that was for an electrician to come out.
I’ve messaged him and told him this and also some of his work I’m not entirely happy about.
He has read it but hasn’t replied but I’m doubting myself and wondering if I’m being unreasonable or if I have a point.
I also haven’t paid him yet as he was coming back today for it.