To think 'how the fuck will we manage'...

185 replies

WiddlinDiddlin · 22/12/2023 04:27

Post relates to Disabled Facilities Grant.

Finally, I have a date for the start of our disabled facilities grant (DFG) funded kitchen and bathroom refurb... i have been waiting almost 7 years for this!

2nd of January.

They want to do both at the same time. The contractors are meant to be managed by someone else... but in reality, we're on site - we have to live here and we can't move out whilst the works are done, oh and I also have to work whilst the work is on-going, from home or I have no income.

Um...

This is going to be hell isn't it?

Practical suggestions - DP, myself and three dogs will be spending all day confined to livingroom and back yard, with contractors having to access upstairs, hall and kitchen via the front of the house.

I have space to have kettle and a tub with basic food stuff in here.

We will apparently have a working toilet by the end of each day.

Realistically... how long would one expect this to take. From childhood I recall a similar size kitchen and bathroom job being done by my two parents and some child labour in around four days each, I expect they'll have more people though.. but then I also suspect it benefits them if it takes longer... and they know that whilst I am the client, I am not the person they directly answer to (something I am not overly happy with but theres nothing I can do). I am worried about piss-taking...

Any ideas whatsoever to reduce stress... stress tends to trigger autonomic dysfunction and I am already pretty much buggered working 3 shifts a week (2 til 10, thats another issue, I sleep til 12, ill have to be up and downstairs by 8.30 I expect at the latest!)...

I wish I had a responsible adult do sort this out for me, I realllllllly do, but the only one there is is... me!

OP posts:
WiddlinDiddlin · 22/12/2023 22:18

Oh im trying not to think about what they will find when they remove fittings... I got the kitchen with the house, which i bought off my sister, and it was here when she moved in... and bits of it probably date to the late 70s... uuuuuugh.

Head in sand, get Christmas done with first! Lalalala, fancy toilet, happy thorts etc!

OP posts:
Daffodilsandtuplips · 22/12/2023 21:57

It will be worth the chaos, a downstairs toilet is a game changer.

The fitters finished at around 4.30 pm ish each day and before leaving they ensured we had power and water supply, a working toilet downstairs. If you’ve got power overnight you could use the slow cooker then and decant into wide food flasks? I made sure we had enough clean clothes for the estimated time given at the start of the planning. It took a little longer than estimated because the plaster on one wall had blown and needed rectifying, this was only discovered once the cabinets were taken off the wall. But apart from that everything else was ok.

WiddlinDiddlin · 22/12/2023 20:46

To be honest, I normally have a diety shake thing for breakfast and a sandwich or toast for lunch anyway so its the evenings we need to cook for, and they can't leave us without power over night, we both have equipment that requires power!

OP posts:
Daffodilsandtuplips · 22/12/2023 18:55

The suggestions of using a slow cooker are great BUT the power supply is bound to be interrupted for indeterminate periods of time throughout the day.

WiddlinDiddlin · 22/12/2023 17:20

Gotta keep my eyes on the prize here haven't I!

The toilet will mean DP can go out and not have to be within 'oh shit come back quick' range. That will improve his mood no end and up both our quality of life dramatically!

Kitchen will mean I can make a brew and a snack by myself, and make proper meals with just minor 'kitchen porter' help.

It will be worth the utter chaos.

OP posts:
Fooshufflewickjbannanapants · 22/12/2023 15:40

@WiddlinDiddlin Oooh you'll love the fancy toilet! My son has one and it washes and dries him and cleans itself and by a wave of the hand, you can adjust heat and pressure it's literally been life changing!!!

WiddlinDiddlin · 22/12/2023 14:02

Some good ideas and some experiences here giving me a bit of hope, thanks folks! Dust sheets! Mmm! Mini kitchen in living room - was my plan, have air fryers.

I think I can scrounge up somewhere to store a lot of stuff too and less stuff should = less stress.

Sorry, I didn't really give useful information did I - blame the hour and the brain monkeys who have been waiting years for this and are now going ARGH, WHAT, NOW, REALLY?...

Part of me doesn't really believe its happening, having had three applications fall over due to people leaving and just dumping my case seemingly in the bin rather than passing it to the next person!

Bathroom:

Knock out the wall between loo and bathroom - rip all out - replace bath for walk in shower, replace loo for Geberit fancy-schmancy toilet, replace sink for something not from the 1980s and sized like a small swimming pool, put in some sort of heater (there is no heating upstairs in my house!)...

Meter cupboard (where our fridge lives, don't ask) - update some electrical gubbins (probably the fuse box circa 1980s)

Kitchen:

Rip the lot out and replace ancient galley kitchen for more accessible galley kitchen, inc flooring kitchen and hallway for wheelchair appropriate floor surface. I'll be losing the oven and hob, and getting a combi micro and portable hob if we want it (we already have TWO air fryers and rarely use much else) and they're including a slot for a DISHWASHER ... WOOOOOO..

I spoke to the contractor yesterday who did state they want to do both at once, which I am v not sure about as my OT suggested one at a time, but i suspect they do want to be done and out asap really.

Going elsewhere - isn't an option. I am currently and for the foreseeable, housebound, fortunately DP is my full time carer and is here with me so he's the go-fer, but he cannot oversee works, spot wobbly things and say 'um, that finish is NOT to spec... '

The works are supposedly managed by Millbrook Health Care but my confidence in them is... low, to say the least, for various reasons (I had to chase them to discover the technical officer for my case had left and chase again to find out who had taken over... they treat me like a mushroom!)

Booking the dogs anywhere not possible, this the sort of area where half the population bogs off for december/jan and puts their dogs in kennels/home boarding - everything vaguely acceptable would have been booked by this time last year.

paper plates/reduce washing up - genius, yes.
turn off rad in hallway so only heating living room. have an electric heater if central heating off.
I think ill put a little lock on the living room door so no one can accidentally open it and let dogs out into the street should the front door be open (which I assume it will be literally all the bloody time)..
draught excluder!
Work - i suspect i can ask not to take calls between 2 and 5, we take very few anyway its mostly instant messaging and FB.
Teach myself not to need a poo before 5pm... (the other isn't an issue, I have a bucket!)
Showering.. lol, I have been strip washing since 2018!

Ok... I can do this, this is do-able. I've lived on building sites before (ok I was a child and not a housebound wheelchair user... shh, mere details).

Embrace the chaos right?!

OP posts:
LetMeGoogleThat · 22/12/2023 11:13

Can you speak to your OT or whoever has supported the application? We had a similar issue when my dad had to get his bathroom refitted via DFG and they relocated him whilst the work was happening.

Lemondoughnut · 22/12/2023 11:11

WiddlinDiddlin · 22/12/2023 04:27

Post relates to Disabled Facilities Grant.

Finally, I have a date for the start of our disabled facilities grant (DFG) funded kitchen and bathroom refurb... i have been waiting almost 7 years for this!

2nd of January.

They want to do both at the same time. The contractors are meant to be managed by someone else... but in reality, we're on site - we have to live here and we can't move out whilst the works are done, oh and I also have to work whilst the work is on-going, from home or I have no income.

Um...

This is going to be hell isn't it?

Practical suggestions - DP, myself and three dogs will be spending all day confined to livingroom and back yard, with contractors having to access upstairs, hall and kitchen via the front of the house.

I have space to have kettle and a tub with basic food stuff in here.

We will apparently have a working toilet by the end of each day.

Realistically... how long would one expect this to take. From childhood I recall a similar size kitchen and bathroom job being done by my two parents and some child labour in around four days each, I expect they'll have more people though.. but then I also suspect it benefits them if it takes longer... and they know that whilst I am the client, I am not the person they directly answer to (something I am not overly happy with but theres nothing I can do). I am worried about piss-taking...

Any ideas whatsoever to reduce stress... stress tends to trigger autonomic dysfunction and I am already pretty much buggered working 3 shifts a week (2 til 10, thats another issue, I sleep til 12, ill have to be up and downstairs by 8.30 I expect at the latest!)...

I wish I had a responsible adult do sort this out for me, I realllllllly do, but the only one there is is... me!

Oh, forgot to say. It's probably a good idea to put dust sheets up (if there's any sanding or plastering happening) over living room and bedroom doors as it creeps in everywhere.

Vettrianofan · 22/12/2023 11:11

You don't have kids when all this is going on. Be thankful! I had four DC to deal with when our kitchen bathroom was being refurbished

MolkosTeenageAngst · 22/12/2023 11:08

Can you leave the house during the day and work from a library or cafe or somewhere just so that you’re not stuck inside with the works going on for the whole time? I imagine they will be noisy and potentially hard to work through.

Lemondoughnut · 22/12/2023 11:07

WiddlinDiddlin · 22/12/2023 04:27

Post relates to Disabled Facilities Grant.

Finally, I have a date for the start of our disabled facilities grant (DFG) funded kitchen and bathroom refurb... i have been waiting almost 7 years for this!

2nd of January.

They want to do both at the same time. The contractors are meant to be managed by someone else... but in reality, we're on site - we have to live here and we can't move out whilst the works are done, oh and I also have to work whilst the work is on-going, from home or I have no income.

Um...

This is going to be hell isn't it?

Practical suggestions - DP, myself and three dogs will be spending all day confined to livingroom and back yard, with contractors having to access upstairs, hall and kitchen via the front of the house.

I have space to have kettle and a tub with basic food stuff in here.

We will apparently have a working toilet by the end of each day.

Realistically... how long would one expect this to take. From childhood I recall a similar size kitchen and bathroom job being done by my two parents and some child labour in around four days each, I expect they'll have more people though.. but then I also suspect it benefits them if it takes longer... and they know that whilst I am the client, I am not the person they directly answer to (something I am not overly happy with but theres nothing I can do). I am worried about piss-taking...

Any ideas whatsoever to reduce stress... stress tends to trigger autonomic dysfunction and I am already pretty much buggered working 3 shifts a week (2 til 10, thats another issue, I sleep til 12, ill have to be up and downstairs by 8.30 I expect at the latest!)...

I wish I had a responsible adult do sort this out for me, I realllllllly do, but the only one there is is... me!

We had this scenario for 7 months just moving from room to room as it progressed.
I can't deny it was hell but try to focus on the end result it is afterall just a brief spell of inconvenience for a worthwhile (🤞) result.
We found the slow cooker very useful.

AudiobookListener · 22/12/2023 11:07

Can you ask your OT to include provision of a portable toilet cabin for your front garden, (if you have one) I mean the workmen will need the loo too. You'll still need to store as much water as possible for cooking etc. Drink cans of pop instead of water, use antiseptic hand wipes to wash. Eat microwaveable ready meals or sandwiches, fruit, cake etc. Wee in a bucket (obviously, not easy for anyone disabled) and tip it down the drain. I think it can be done. It won't be worse than the average camping holiday. Lack of electricity for wfh may be tricky, but hopefully not all the time.

Nannyfannybanny · 22/12/2023 11:01

Terraced,same here. Open plan bungalow,DH did kitchen, while working,long commute,so could only work on it, Sundays. Took months, he had to dig up concrete floor for new pipework. I washed up in the bath on my knees! When came the bathroom, I said I would live with the pink suite rather than a building site again. We had a toilet,chucked a bucket of water down from the butts outside to flush, washed in the kitchen sink, again several months.

Sugarsun · 22/12/2023 10:55

The biggest issue would be having no water for food, drinks and the toilet.

I would fill some containers to use for the kettle.
Also put the kettle and microwave in the front room and have meals that require little preparation.

I would look into internet cafes or libraries, where you’re able to work all day but also have chance to use the toilet whenever you want.
Some university libraries will let you work there but you’ll need permission first.

There’s no way I could go all day without going to the toilet and so this would be my priority.

Peacelily001 · 22/12/2023 10:48

Fooshufflewickjbannanapants · 22/12/2023 06:58

Are the contractors working via the DFG or did you get the cash and choose independently? I ask because we had our kitchen done independently and they fannied around but our wet room for our disabled sone was done via a contractor through DFG and they were brilliant, cracked on and essentially turned a walk in wardrobe into a fully functional wet room in five days, it's really important to them to keep their contracts with the grants team and they worked hard, cleanly and were smashing people!

This makes all the difference.

If the local authority use trusted contractors to do the work, they are usually brilliant, understand that the client/s are disabled and get the work done as quickly and efficiently as possible.
Im an OT and a wet room adaptation would usually take around a week.

Rosscameasdoody · 22/12/2023 10:42

If it’s a disabled facilities grant speak to the OT who liaised if you can and explain what’s going on. I don’t see how it’ll be liveable for someone with a disability if they’re doing both at the same time. I had a wet room installed a few months ago - admittedly not via DFG - but that took ten days and was fairly disruptive.

horseyhorsey17 · 22/12/2023 10:41

I'd book an airbnb- definitely less stress. Just having my kitchen done last November was a huge pain on its own - it took three weeks to redo completely from scratch, plastering and tiling as well, and my builders were pretty efficient, so I'd assume at least a month for what you're getting done.

I WFH and it was freezing cold with the back door open all the time, and the builders played hideous Romanian hiphop (which clearly is a thing) which drove me nuts, and having a microwave in the utility room to do the cooking stank the house out. Definitely get out if you can!

Redburnett · 22/12/2023 10:40

Perhaps put the dogs in kennels or ask friends or relatives to have them while work ongoing

bonzaitree · 22/12/2023 10:29

I know how you feel OP! I got my bathroom done over lockdown. One bathroom here.

Can confirm they will never ever leave you without a loo. I would have gone to the gym / office to shower but it was lockdown so I just had strip washes in the sink in the kitchen. Ask neighbours if you can go over for a shower or shower at the gym or your workplace. Puregym gym membership you can cancel any time and it’s like £15 per month so might be a good investment.

Put microwave/ kettle and some crockery in the living room so you can make a brew and something quick for lunch without getting in the way (pot noodles, tins of soup etc.)

You might have to have some microwave meals for tea some days or go out for tea but that won’t kill you.

Crumpleton · 22/12/2023 10:13

Lots of ideas suggested OP.

. i have been waiting almost 7 years for this!

But this^^ keep what you have written above in mind, and start the new year knowing that there will be no more waiting.
Hope everything goes well and you enjoy your new renovations.

Flossflower · 22/12/2023 10:06

When we had our kitchen done, I bought a plug in tabletop oven with 2 rings. It was fine for 2 weeks.

Jk8 · 22/12/2023 09:55

Get a gym trial membership to shower & use toilets at local shops- no help or advice outside that

CleansUpButWouldPreferNotTo · 22/12/2023 09:50

Practical stuff - you work from home, what about toilet facilities, if working toilet at end of each day, what do you do during the day? If no other loo or sink available, save 2 litre bottles and buy or borrow a 5 litre jug and fill with water each night. You will use more water than you think, so have several filled and stored.

Have you got a friendly neighbour or cafe nearby who would let you use toilet facilities? Otherwise, use an empty margarine tub for a quick wee during the day, empty discreetly in the garden where the dog goes.. save number 2s for when builders are gone!

Dust gets everywhere - I recommend taping plastic (best) or fabric (ok but can be porous) to the sitting room door frame, helps to keep out the worst. The builders gave me a huge piece, they had a big roll of it which they covered stuff with. Use masking tape rather than gaffer or parcel tape as it wont take the paint off.

Kettle, toaster, microwave, slow cooker will give you decent cooking facilities along with getting them to put your fridge in one corner of the sitting room.

They generally get paid by the job so should be actively working to minimise their time on-site.

Grit your teeth and think of how lovely it's going to be. Good luck - I had seven months of it on a major extension but now have a proper ground floor brick-built room with adapted bathroom and wheelchair ramp from the front rather than a leaky conservatory, no downstairs loo and steps from the street. It was worth it..

SmileyClare · 22/12/2023 09:48

BerriesNutsConkers · 22/12/2023 09:06

So many glib posts on here without regard to cost or ignoring the fact that the op is disabled and has a limited income!

Rent a cottage. Join a gym put dogs in kennel...........that ll takes money!!!

The stress of having your house turned upside down is a lot to cope with before you factor in a disability / health condition made worse by stress.

I hope it goes well for you , try and focus on how much better it will be once it is finished. Any scope to change or reduce your hours while the work is being done?

I agree.
A person with a serious health condition working part time and eligible for state funding just can’t afford hotels, kennels for three dogs, or to jet off on holiday!

More information of your situation might help but I’d encourage you to lean on friends or family for some help.

I think working 3 shifts a week from home (particularly as most will be in the evening) sounds do able.

If your health condition means you need to sleep until midday most days then so be it. You’ll have to let workman in and rest upstairs. You don’t need to be “on hand” the whole time they’re there.