Please or to access all these features

AIBU?

Share your dilemmas and get honest opinions from other Mumsnetters.

New bathroom £9000?

62 replies

Nicho59 · 15/11/2021 19:06

Just had a quote for a new bathroom installation. The £9k is inclusive of suite incl separate shower flooring and redecoration. About £4k of that is fitting costs and it will take 2 weeks. Any thoughts fols?

OP posts:
New posts on this thread. Refresh page
IloveJudgeJudy · 15/11/2021 22:44

Sounds about right to me. We had a family bathroom, no bath, but big shower and also an en-suite replaced 1 and 11/2 years ago. Both cost £8k each.

Bloodybridget · 15/11/2021 22:35

Sorry 9k!

LittleDandelionClock · 15/11/2021 22:35

Wouldn't surprise me. We had a new bathroom in a 3 bed semi in 2007, and that cost £5,000.

Bloodybridget · 15/11/2021 22:34

I wish ours had just been 6k

Knickynackynoo · 15/11/2021 22:33

We paid around 6k all in 2010, we moved the bathroom....well not moved it out put it in the box room as it had originally been downstairs at the back and we were doing a lof ex which replaced the need for box room.

Anyway I digress, was the mid range quote for fitting but we had high spec materials/fittings (travertine tiles, kohler bath and taps).

I think for SE at this moment that sounds about right but hard to know without knowing what fittings you've chosen, if you need to bring it down that's where you can save.

Lightswitch123 · 15/11/2021 22:26

I need to retrain as a tradesperson!

Chloemol · 15/11/2021 22:15

Sounds about right to me

TheNoonBell · 15/11/2021 21:43

Yeah we did floor to ceiling tiling everywhere with lots of odd corners so loads of off cuts. Even had to emergency order more tiles due to the odd bits. Looks bloody good though.

Tomorrow I will do a poo in there for the first time. No one has gotten to christen it before me :D

StrawberriCream · 15/11/2021 20:22

The tilers round here chare £85 per square metre so depends how much tiling you have perhaps consider less?

NatMoz · 15/11/2021 20:18

Ours was £4.5k including fitting 2 years ago but we sourced the 4 piece suite, tiles etc ourselves online/B&Q rather than a catalogue provided by the bathroom fitter.

bcdefghijklmnopqrstuvwxyza · 15/11/2021 20:16

My new bathroom getting fitted in 2 weeks is about 6500 complete rip out and start again.

TheNoonBell · 15/11/2021 20:15

We just paid 10k they finished last week, about 4k more than a basic one but it looks amazing. Full refurb of a 1980's tasteful sea blue bathroom with brown trimmings to an ultra modern walk in shower with posh tiles, nice lighting and a super dooper digital shower thing. Also upgraded the hot water tank to twice the size and unvented for power.

Worth every penny, even the installer was impressed.

Saz12 · 15/11/2021 20:15

Sound right. Horrendous cost, and the suite will be plastics based at that!

We had one (badly) fitted about 4 years ago (toilet, basin, bath, shower, tiled, replastered, extractor, lighting) cost £7k. Didn’t last well. DH & I replaced vanity, bath panels, cistern ourselves.

VitalsStable · 15/11/2021 20:15

I'd snap their hand off, we had a quote of £14k to redo out en-suite using the sanitary wear we already had. Was only new shower enclosure and retiling. We still haven't had it done!

JunoMcDuff · 15/11/2021 20:10

And it took 4 weeks, which was 1 week more than estimated but there were mitigating factors (the labourer robbed the plumber (cash and tools) one day and the plumbers daughter ended up in hospital).

Champersandchocolate · 15/11/2021 20:10

If you want to keep costs down I suggest:

Buy all materials yourself or the trades will mark up on products - Toilet, basin, cupboards, shower enclosure, bath, tiles, grout, water proofing paint, towel rail, mirror etc etc.

Then ask the plumber what his day rate is - if he's expensive, ask another plumber what his day rate is.

A tiler may be cheaper than a plumber - get a quote for the tiling separately from a tiler, he'll probably get it done in one day.

Get day rates not a quote for the full job.

We renovate property, to make money to survive we either have to do it ourself or wait for a quote. Just recently we are having a wall removed, our first quote was 18k, our second quote was 6k our 3rd was 5k we have found someone to do it for 2k - there was no difference in qualifications or experience in these builders, they just like to try it on.

JunoMcDuff · 15/11/2021 20:08

Depends on size and spec. Ours was a 4 piece suite, complex installation, medium size room and mid quality fittings/ tiles. Cost £14k. Cheaper quotes failed to take in to account the complexity of the fitting. I'm glad we paid more, we're very happy with it. Fitting was about half the cost.

FangsForTheMemory · 15/11/2021 20:05

Don't go to a fancy bathroom company, get a local independent fitter to do it, and you will immediately save money. I got quotes for my kitchen (2m square) of £10K and £11.5K excluding appliances. I eventually paid about £7.5K including appliances (which I chose myself, so I got exactly what I wanted). Same chap refreshed my bathroom (I didn't get a new suite, just new tiles, shower screen and shower, repainted and new flooring) for less than £3K. If it's a good local tradesman, they will actually talk you through everything so there are no surprises.

Opal8 · 15/11/2021 19:49

Yes ours was 2 weeks too

TheCrowFromBelow · 15/11/2021 19:49

Just paid similar for our en suite refurb. 2 weeks, 2 people, complete refit and full retile. We are SE. Had a quote for £14k Shock which we turned down.

Opal8 · 15/11/2021 19:49

fairly high spec

Opal8 · 15/11/2021 19:48

Should have said bathroom furniture fairly move spec but tiles fairly cheap
Needed a fair bit of electrics sorting too

Georgyporky · 15/11/2021 19:47

How many quotes have you got? Are they all about the same?

Newnormal99 · 15/11/2021 19:46

I have just had two quotes. Gutting a small bathroom including removing floor to ceiling tiles, making good then installing new fitting decorating and half tiling. Building a smal stud wall
Two quotes within £50 of each other at just over £5k. 10-13 days work.

Plus then bath etc I'm looking at probably £8k all in even keeping price down on fittings.

MrsTWH · 15/11/2021 19:43

Really depends on size of bathroom, fittings/tikes chosen and whether you’re moving any plumbing, etc.
I’ve just had 3 bathrooms ripped out and replaced plus a downstairs loo. It’s cost in the region of £50k but we moved walls and redid all the plumbing, etc. It’s taken about 4 months.