House purchase - no completion certificates for extension/renovation

40 replies

Bellendejour · 28/06/2021 21:53

Hello all!

I’m posting for a friend who is having some major last minute house purchase stress. In a nutshell:

With one week to go until we are supposed to move in we’ve just found out that the sellers never applied for completion certificates for the house extension which kind of means the planning permission isn’t really valid. They’ve offered to get us some kind of indemnity insurance but it doesn’t feel enough as what would happen if we decided to sell?! Going to try and see if they’ll lower the price.

The solicitor has been quite shit. And they’ve changed the whole house around including an extension up and to the side and changed the kitchen to the bathroom (or something like that). They’ve applied for building warrants for all of the work but only have 1 completion certificate when there should be 4…

Does anyone have any advice on what they should do, what they need to get the (shit) solicitor to do, what the indemnity needs to cover, how much money off to ask for, any other screaming issues with all of the above?

Thanks so much for any help, obviously all very stressful at this stage!

OP posts:
New posts on this thread. Refresh page
JudgeRindersMinder · 29/06/2021 12:45

@VeryLittleOwl just make sure your friend checks with her lender, it was the lender who wanted the certification for our old house, as it was perfect on the Home buyers report

VeryLittleOwl · 29/06/2021 12:42

@Bellendejour

Thanks so much everyone!

The work was done 10 years ago. Friend says: “It all works on a good report in Scotland which said all was fine assuming permissions had been granted…”

They haven’t concluded missives yet.

That makes sense - the home report is commissioned by the seller and made available to all interested buyers, buyers don't pay for a survey up here.

My view would be that if the surveyor has said the work is fine, which is what it sounds like, then I'd go ahead and buy with indemnity insurance in place.

Bellendejour · 29/06/2021 12:37

Thanks so much everyone!

The work was done 10 years ago. Friend says: “It all works on a good report in Scotland which said all was fine assuming permissions had been granted…”

They haven’t concluded missives yet.

OP posts:
JackieWeaverHandforthCouncil · 29/06/2021 11:41

If it was done years ago and you’ve had a proper survey done then you’ll be fine to proceed. If it was done last year and you haven’t had a proper survey insist they get the certificates.

SmokeyDevil · 29/06/2021 11:26

@FeckingPuddleDuck

Thats fair enough and it probably would be OK, it's just not something I could do, it would drive me mad. But I do have quite a lengthy list of things I will refuse to deal with when it comes to houses, and that would be a big issue that would send me running. Grin

JudgeRindersMinder · 29/06/2021 11:24

How long ago was the work done?

We are in Scotland too

We were in this position as sellers 2 months ago, except we hadn’t applied for completion certificate Blush We had done the work in 2006.

It was really simple to rectify-we had deviated from the approved plans (building warrant, not planning permission) in that there was an aspect of the job we hadn’t done. All we had to do was submit amended plans, which I did with the help of a piece of paper and a pritt stick Grin, and an electrical safety certificate, and it was all approved and we had the certificate within 48 hours.

It cost us £300 in total, £100 for the certificate and £200 for the electrical inspection

FeckingPuddleDuck · 29/06/2021 11:16

@SmokeyDevil

You would get a survey done to satisfy yourself that the house wasn't going to collapse on you or your family. Not rely on 10 year old building regs certificates (or however old it may be). A lot of the time these works were done years ago and as there is no time limit on requiring building reg certificates like there is on planning permission in order to sell, a lot of th time it's simply covered with indemnity.

If you have any concerns (and even if you don't) you should be getting a proper survey done before you move in not relying on old paperwork.

Yeah hopefully they have had a survey done, but I still find it dodgy that they haven't bothered doing the proper paperwork, especially all of it, they got 1 but not the other 3, why? If they can't be bothered doing that, what else did they not bother doing? It's a lot of money to gamble and it's not one I would take a gamble on. Maybe the house will be fine, but hiding those kind of details just makes them look untrustworthy. I'd quite happily walk away and let someone else take the risk, wouldn't bother me in the slightest.

Of course you are quite right to not take a 'gamble' on anything you don't wish to. I am only speaking from experience that these things are extremely common place in conveyancing.

It can be for a number of reasons. A common one I come across is that the sellers didn't actually do the work, it was bought by them after the works and they too didn't get any paperwork. I've had people who didn't know they needed to get BRegs for certain things (commonly new windows and boilers, people never seem to have them for those or seem aware that you should), I've had things like the company who did it have disappeared but didn't register it at the time, paperwork lost and so on... I wouldn't jump straight to trying to hide something especially if I knew the buyer had had a proper survey done too.

It can be difficult trying to enquire about it too. They don't always show on the local searches but that doesn't mean they haven't been done. But you go and enquire with the council to check and then you can't get an indemnity policy (or not as easily anyway).

It can turn into a lot of hassle which, in my experience is not usually worth it.

It's entirely up to the person buying whether they wish to go ahead but as I say it is incredibly common. It wouldn't surprise me if any other house the OPs friend put an offer in on didn't have some sort of paperwork for something or another. It's very rare that a seller has absolutely everything to hand.

SmokeyDevil · 29/06/2021 11:04

You would get a survey done to satisfy yourself that the house wasn't going to collapse on you or your family. Not rely on 10 year old building regs certificates (or however old it may be). A lot of the time these works were done years ago and as there is no time limit on requiring building reg certificates like there is on planning permission in order to sell, a lot of th time it's simply covered with indemnity.

If you have any concerns (and even if you don't) you should be getting a proper survey done before you move in not relying on old paperwork.

Yeah hopefully they have had a survey done, but I still find it dodgy that they haven't bothered doing the proper paperwork, especially all of it, they got 1 but not the other 3, why? If they can't be bothered doing that, what else did they not bother doing? It's a lot of money to gamble and it's not one I would take a gamble on. Maybe the house will be fine, but hiding those kind of details just makes them look untrustworthy. I'd quite happily walk away and let someone else take the risk, wouldn't bother me in the slightest.

mumwon · 29/06/2021 11:01

If you got a full structural survey wouldn't that show if extension was substandard (or up to standard?)?& than get them to get indemnity?
Asking out of interest?

FeckingPuddleDuck · 29/06/2021 10:51

@SmokeyDevil

Nope I'd run away. You only find out a week before and they didn't even tell you themselves. Possibly hiding something, if you're willing to take that risk go ahead, but who knows who actually did the building work and if it was done right. I'd not want to risk it collapsing on me or my family.
You would get a survey done to satisfy yourself that the house wasn't going to collapse on you or your family. Not rely on 10 year old building regs certificates (or however old it may be). A lot of the time these works were done years ago and as there is no time limit on requiring building reg certificates like there is on planning permission in order to sell, a lot of th time it's simply covered with indemnity.

If you have any concerns (and even if you don't) you should be getting a proper survey done before you move in not relying on old paperwork.

Aprilx · 29/06/2021 10:26

I don’t see the logic in trying to get money off. If you have to reverse the works a bit of money off now will be cold comfort.

Bellendejour · 29/06/2021 10:25

OMG thank you so much for all the responses! I’ll share with my friend and come back on any questions! (She’s not on MN) xxxxx

OP posts:
SmokeyDevil · 29/06/2021 10:20

Nope I'd run away. You only find out a week before and they didn't even tell you themselves. Possibly hiding something, if you're willing to take that risk go ahead, but who knows who actually did the building work and if it was done right. I'd not want to risk it collapsing on me or my family.

TorySteller · 29/06/2021 09:25

Agree with @FeckingPuddleDuck. This is incredibly common.

When we bought our own house, it had a garage conversion with no regs. It was done about 8 years before we bought it. We had a survey done and the sellers took out an indemnity policy. That was that.

FeckingPuddleDuck · 29/06/2021 08:22

You seem quite relaxed about this, but won't it cause difficulty with the lender?

I seem relaxed about it because it happens all the time, I'd say at least 80% of all house transactions I work on don't have all the correct paperwork for various things and 9 times out of 10 a lender will accept indemnity insurance. It happens that often that if they didn't they'd never get to lend on anything!

And what if it transpires the work was unsafe?

Well I would suggest, regardless of this situation, that anyone buying a property has a proper survey done.

If the works were 6 months old I'd say the best thing to do would be to try and obtain the certificates (most indemnity providers don't cover works under a year in age anyway). But something like 10 years old and you've had a proper survey done? Yes I'd accept the indemnity personally and not think any more of it.

TheGenealogist · 29/06/2021 08:05

Have they concluded the missives? If that has been done (like exchange of contracts in England), they may not be able to just pull out.

This happened to the vendors when we moved into our house - they had concluded the missives with us, but had some real legal issues with the house they were going to move into. On moving day they had no option but to move out and let us in, but had to go into rental as their purchase had fallen through.

They need to hassle their solicitor to be more on the ball.

MyHusbandTheIdiot · 29/06/2021 08:05

(Also this should have come up WELL before now, I’d be having some serious words with your solicitor…)

whatthejiggeries · 29/06/2021 08:04

Just get the seller to pay for indemnity insurance and it will be fine

GreyEyedWitch · 29/06/2021 08:04

I would insist that they get planning permission in retrospect or else I'd pull out. It usually takes around 6-8 weeks to get planning permission though.

MyHusbandTheIdiot · 29/06/2021 08:04

Not a chance in hell I would complete without the work actually being signed off unless it was done a really long time ago (and hasn’t fallen down yet….) - we sold recently and had to wait for the council to issue completion certificates which had been delayed by COVID, and they were a nightmare to get, and required a lot of remedial changes to actually get the sign off, in spite of the fact our builders were pretty good! You’d run the risk of inheriting non-compliant (and potentially unsafe) work.

Somuddled · 29/06/2021 08:03

Indemnity insurance only cover you for the council taking action not for if the work is shoddy. Has anyone informed your lender yet? We had this with our current house. They had converted the basement and put the kitchen down there. No sign off at all. They did get the council to try to give them retrospective certificates and the council confirmed that it wouldn't pass (it was really poorly done) Our solicitor had to inform our lender who done valued the house significantly as they said they considered the house to have no kitchen. Meaning we had to up our deposit (but still massively reduce our offer) and now we are in the process of moving the kitchen back upstairs. My point is, your lender may well determine the outcome. Unless you're a cash buyer?

ApolloandDaphne · 29/06/2021 08:00

@Singlebutmarried

Also who on earth extends their house and spends money on remodelling once they’ve sold.
I don't think OP is suggesting this has happened at all. I am assuming it is works that were done some time ago but completion certificates were never sought.
notanothertakeaway · 29/06/2021 07:56

@FeckingPuddleDuck

Honestly this is so so common. Obviously you do what you feel comfortable with but as a solicitor who deals with house sales and purchases all day, I don't bat an eyelid at this.

How old is the extension? Did the sellers do the extension or were they too just not given the paperwork when they bought?

as what would happen if we decided to sell?!

You'd give indemnity insurance to the buyer same as has been suggested here. Providing it wasn't erected a few months ago this really isn't a huge issue (generally speaking obviously what you choose to accept is up to you) in conveyancing.

You seem quite relaxed about this, but won't it cause difficulty with the lender?

And what if it transpires the work was unsafe?

OP, I wouldn't be too hasty to withdraw from the purchase. Suggest you find out how long it would take to get the completion certificates. Possible the work is all fine, but just needs to be signed off

Singlebutmarried · 29/06/2021 07:51

Also who on earth extends their house and spends money on remodelling once they’ve sold.

Singlebutmarried · 29/06/2021 07:50

Surely this should have been in the home pack that the vendor pays for?

As it’s Scotland can your friend still pull out as I thought once a date was set that was it.