Please or to access all these features

AIBU?

Share your dilemmas and get honest opinions from other Mumsnetters.

To ask how long you'd expect someone to take to decorate one room?

82 replies

seasidefishwife · 22/02/2021 13:14

Small double room. One wall to be papered, two walls white. One dark grey. One hole to fix. Plus skirting boards.

I ask as DH had all last week, and he's still not halfway through. WTF is taking him so long???

OP posts:
DoubleHelix79 · 22/02/2021 14:46

I could paint three walls of a small double room in about a day if starting reasonably early. Haven't wallpapered in many years, but if only one wall I'd probably do it in a day, even taking into account a few mistakes or having to look things up. Painting skirting boards - if they're in not great condition probably another day.

Drivingmecrazy2021 · 22/02/2021 14:44

Took me 2 days to do 3 rooms, did one whilst the other was drying etc.
Included one large wall of wallpaper.

TillyTopper · 22/02/2021 14:43

Decorating wouldn't take much time at all. But the prep takes me a long time: Emptying the room, carpet up, sanding down, undercoat, filling holes, removing wallpaper (that is the worse), etc. It really depends what he's starting from.

If it was emulsion on the walls and gloss on the woodwork with everything in reasonable shape it would take me 5 days from starting to sand/fill to completion.

Grilledaubergines · 22/02/2021 14:41

To do a proper job, 2-3 days.

BoyTree · 22/02/2021 14:40

would leave 2 days for filler to dry

2 days?! What kind of filler are you using?

It would probably take me 2-3 days - painting walls is quick and easy, but if you're using two colours then they really need to dry to avoid the edges going weird, same with wall papering.

Assuming that the clearing is done, I'd do filling and sanding first, then wallpapering and paint the opposite wall (assuming that's the grey one) on the first day - paint, wallpaper, second coat of paint.

Second day would be two coats on the other walls and starting on the woodwork not near the wet paint.

Third day would be the skirting boards - I'm impressed with those who would do woodwork first as I always go for the 'top to bottom' approach to limit how much gravity screws me over!

RubyRedBerry · 22/02/2021 14:39

i do all the decorating here, i tend to fill / sand etc in the evenings. start early on a sat morn then i can get both coats of paint done in a day (drying time in between). took me 3 days to do the living room but it has built in furniture which i paint, and that needed 2 coats too.

sounds like he's faffing....i'd be swapping roles next time!

purpledagger · 22/02/2021 14:36

My OH would say 3-5 days, but he is adamant that prepping is the key, so would spend a lot of time sanding, filling holes and undercoat. This would take 1-2 days.

But, it's easy to get side tracked or lazy when decorating and I suspect your DH has one or the other.

Turfaccountant · 22/02/2021 14:31

I'll out myself here but my DH is known for taking weeks if not months to complete a room. He's massively pedantic and every inch of the room has to be done. Light pendants off the ceiling, all switches and sockets removed, everything sanded or rubbed down at least twice. It used to drive me to insanity but after 30 years I'm used to him now. I just let him crack on with it

Nancylovesthecock · 22/02/2021 14:28

Me? A day. But then I fucking hate decorating and would do a fast shit job to get it over with as quickly as physically possible.

seasidefishwife · 22/02/2021 14:25

And he's not doing the ceiling, BTW.

OP posts:
nothingcanhurtmewithmyeyesshut · 22/02/2021 14:25

Does he have to move loads of stuff or is it empty?

LyndaSnellsSniff · 22/02/2021 14:24

I’m intrigued by the posters saying they do the woodwork before the walls. I’ve always done the woodwork last of all.

Also, whoever mentioned Zinsser 123...it’s amazing stuff!

IloveFebruary · 22/02/2021 14:22

Laughing at a couple of hours though.

IloveFebruary · 22/02/2021 14:21

A week with no disruptions is ridiculous.

Symbion · 22/02/2021 14:21

Fair enough OP. Size of the job also depends on whether you include ceiling and woodwork... which I know it probably should, but we often don't.

I have been so much better at buying paint than I've been at actually decorating this lockdown...

SmallPrawnEnergy · 22/02/2021 14:12

Is this the new MN thing? Competitive decorating. A couple of hours my hairy arsehole Grin it'd be a fucking atrocious job if so.

HeronLanyon · 22/02/2021 14:07

This has given me the itch to get in with my kitchen and sitting room Grin however I know I don’t have everything I need and can’t stand doing a half arsed start and then being in chaos longer than necessary. Hmmm

Loopyloututu · 22/02/2021 14:04

It would take me 1-2 days. I’m good though!

canigooutyet · 22/02/2021 14:04

Couple of hours.
Best thing I did when I moved in. Got rid of every scrap of wallpaper.
Now fancy a change, check for holes, open tin and crack on painting.

Labobo · 22/02/2021 14:03

@AuntieDolly

My husband would take a week, but it would be a lovely job at the end. I’d be screaming ‘just finish it! ‘ as he went round the edges with a tiny brush...
Same here. Me: 2 days but a bit sloppily done. DH: a week but done really carefully and prepped properly too.
BernadetteRostankowskiWolowitz · 22/02/2021 14:03

Depends how much prep work is needed.

Prep:-
Emptying room
Fill and sand holes
Remove previous wallpaper
Sand woodwork ready for painting
(2 days)

Decorating:-
Paint three walls first coat
Wallpaper
(1.5 days for the above)

Paint three wall second coat
(1 day max)

Paint all woodwork plus third coat if needed
(1 day, maybe 1.5 days)

I'm counting a day as 9-5 with a healthy lunch break to be with the family. Decorating my own home I'd blast through working longer days to make sure I did fewer days as possible.

HeronLanyon · 22/02/2021 14:01

It would take me 3-4 days. Most of day one clearing and cleaning room filling holes prepping woodwork (even if just a pre paint wash), taking up anything needed and covering carpet. Possibly undercoat on gray wall.
Day 2 rubbing down filled hole, second coat gray wall skirting and windows.
Day 3 white walls (good one coat white on white I’m hoping) and paper wall. Remove any taping. Allow to dry.
Day 4 I can see some going into a 4th day/touching up/cutting in better/cleaning stuff up. Allow everything to dry fully. Late in day move stuff back in.

If no window involved then a good half day quicker.
If I don’t have everything I need to start then add half a day for getting stuff.
I am a bit careful and slow when decorating.

If I employed someone I’d expect 2 days ish?

whenwillthemadnessend · 22/02/2021 13:59

Painting 2 days max
Wall paper 1 day
Skirting 1 day maybe two if it needs glossing

DramaAlpaca · 22/02/2021 13:58

Day 1 - clean, prep and filling
Day 2 - ceiling, 2 coats
Day 3 - first coat of paint
Day 4 - second coat of paint
Day 5 - wallpaper
Day 6 - touching up, tidying up

So about a week, but I wouldn't be spending all day doing it.

NerdyBird · 22/02/2021 13:57

5 days ought to be enough if there are no nasty surprises lurking.
1 day - take stuff out, sand skirtings, filler
1 day - sand filler, wash down walls, 1 coat of paint
1 day - second coat of paint
1 day - wallpaper (can be tricky), 1 coat of paint on skirting
1 day - finish skirting and clean up

Mind you my bathroom is still not finished and it ought to have taken about 4 days (no tiling etc, just freshening the bad paint job done by prev owners) but DH just wouldn't get on with it and then got miffed when I started doing it myself 🤷‍♀️

Please create an account

To comment on this thread you need to create a Mumsnet account.

This thread is closed and is no longer accepting replies. Click here to start a new thread.