I'm very nervous about getting something wrong here because I've never done it before but am planning to save costs by managing individual tradesmen in my new flat. I'm ripping out a bathroom and having a new one fitted.
It's the only bathroom so I'd like to keep a working loo throughout. I have drawn this list up with some help from AI and want to sense check it with a human who has done it before! I did not, for instance, realise that electricians and plumbers would need to be done in two stages.
Any feedback and general advice gratefully received!
- STRIP-OUT / LABOURER
- Remove bathroom fittings
- Remove tiles & flooring
- Remove/alter boxing
- Remove waste
- PLUMBER — FIRST FIX
- Resite toilet
- Bath plumbing
- Shower plumbing
- Basin plumbing
- Radiator/towel rail plumbing
- ELECTRICIAN — FIRST FIX
- Lighting
- Extractor
- Sockets/shaver point
- Hairdryer
- Underfloor heating
- BUILDER / PLASTERER
- Repair/plaster walls
- Prepare/level floor
- Boxing
- Bath structure
- TILER
- Waterproof/tank wet areas
- Wall tiling
- Floor tiling
- Grouting/sealing
- Bath panel/ledge
- PLUMBER — SECOND FIX
- Bath & taps
- Basin
- Shower
- Toilet finishing
- Radiator/towel rail
- ELECTRICIAN — SECOND FIX
- Lights
- Mirror
- Shaver sockets
- Underfloor heating
- DECORATOR / HANDYMAN
- Paint
- Mirror
- Storage
- Accessories
- Door