Wow! Hope they get the opening ready for the doors in time. It was my point of stress with my doors, feels silly looking back now as it was totally fine.
The screed is finished but I can’t look as they’ve kept the side key for the evening - I was out when they left so not blaming them, just have to wait til tomorrow. It looked good at the halfway stage though.
Re light switches, I’ve dithered and looked at soooo many, and can’t decide so have decided I like what we already have 😂
So have emailed the builders with a link, don’t know if I can get all the different types we may need, but at least can reuse a few bits (some switches downstairs are still the old style white boxes sticking out of the wall, looking forward to them going!).
These ones (this is a dimmer example, most have toggles, which is what I already have)
www.thevictorianemporium.com/store/product/Stepped_4_Gang_Dimmer_Switch
Also, most of our downstairs switches are behind doors as we rehung the doors years ago, really looking forward to being able to easily turn a light on!