I've been at work since 8 and the amount of shit I have to do before half 5 is ridiculous. I'm on my own today so it's all on me, on top of the shit I've already done.
Was waiting for 40 minutes earlier to get a query answered for someone.
I've got 20 letters to type, 12 referrals to send and loads of other little shit jobs.
I clear shit and more shit appears.
I should stop wasting time and do them but I wanna have a hormonal whinge instead.
Roll on half 5.