I know these are a bit 'how long is a piece of string' but we're looking at a house with kitchen leading into a small area at the back which currently has a shower room and wc. I'm wondering roughly what the costs are to make structural changes to make that area part of the kitchen and possibly relocate the wc. It's an area of maybe 4m2. Anyone who has done this and can give me a ballpark figure? We're in the SE