We're having our bathroom redone. It's a large bathroom 5.5m by 2.7m.
Have had a quote for labour 7.5k materials such as plaster, tile adhesive etc 2.5-3k. other stuff is on top such as suite / flooring/ tiles.
The job involves ripping out current suite and tiles. Stripping back everything and then reorganising pipe work a bit. Then they'll refit boards plus insulation plus then plaster the room. Then fit bathroom suite, change radiators, full tile round shower and then half tile rest of the room. Mist coat whole room. Fit out a cupboard (current shower is being changed to a cupboard) and install doors. Finally fitting flooring, probably luxury vinyl tile. Cost also includes removal and disposal of all waste.
He's come recommended by someone who has done lots of work for us. But he's also expensive relative to other quotes but he seems to be able to do everything which is something I do like.
What would you say, does it sound reasonable?