We’ve just had a quote for a full Rewire of a 3 bed semi. it got where we are putting new lights and switches. And then a number at the end for total cost of materials and labour.
im going to also ask
- what condition the house should be in before they start, ie floor coverings removed and anything else
- what level of making good this includes
- a separation of the quote between materials and labour
- does this include rubbish removal
- what type of sockets/ switches
is there anything else?