Wow @Indecisivelurcher for being so near the end!
Like kids, ours is a work in phases. This too shall pass lol. Even when this current but is done, our driveway needs doing.
Our bedroom needs serious redecorating, as does DS2’s. And the spare room. And the front room downstairs which is meant to become my escape haven, dh also wants something done to his study.
But we’ll definitely be having a huge break, not least for the money side of things to recover! But us too. So we’ll have a house of halves, loft and bathrooms and kitchen and utility all lovely and new. The rest, not so much 😂
Our flooring is going down after the kitchen, as it’ll run through into other areas that aren’t done yet and it needs to be tiled all at the same time. Will be one of the last things I think.
Been out for a run, then off to an afternoon tea thing this afternoon. Sorry for those working!