How long between ordering a kitchen and having it installed?

8 replies

KnobChops · 20/09/2020 08:27

Thanks

OP posts:
isseywith4vampirecats · 20/09/2020 11:58

we went with DIY kitchens four weeks delivery in between ordering and delivery we got all the horrid jobs micro managed ie old kitchen out plastering electrics 1st and second fix painting the walls and installation

isseywith4vampirecats · 20/09/2020 12:00

from this 1st picture to second picture

How long between ordering a kitchen and having it installed?
How long between ordering a kitchen and having it installed?
Bluntness100 · 20/09/2020 12:01

We used Wickes, it as three months.

KnobChops · 20/09/2020 13:42

Thanks all. I’ll think along the lines of 3 months and hope that it’s quicker then. Might get them to come and measure up and start the plans before we exchange....

OP posts:
ladybirdsarelovely33 · 20/09/2020 13:52

Howdens - took a few days.
They are the best as do it through trade only so your builder can get stuff at a good rate

Mosaic123 · 20/09/2020 14:04

Don't pay any deposit until you have exchanged and completed. It's not a definite purchase until you've completed and times are very strange.

KnobChops · 20/09/2020 14:14

@Mosaic123

Don't pay any deposit until you have exchanged and completed. It's not a definite purchase until you've completed and times are very strange.
No I won’t
OP posts:
Shelley54 · 20/09/2020 16:59

Wickes three months. But if we'd just wanted the kitchen parts then it would have been a couple of weeks. We used their fitter so it took longer.