We are having a new driveway installed and they have only put drains on one half of the driveway below the window not in front of the storm porch. The driveway slopes towards the house. These are draining into a surface drain as it's clay around here.
So my question is before they pour the concrete should I make sure they put drains all the way along the front? I'm not sure if they can but I am worried about flooding.