Do you need to get building regulation approval/Planning Permission to do the following works in a flat in Chelsea - London:
- Moving a door in a bathroom to another wall by knocking out part of a solid wall to create the new door.
- Cutting a soil cast pipe - We are moving a toilet to a new wall which is closer to the soil cast pipe - so we need to cut a bit shorter the current soil cast pipe to connect to the new toilet wall which will be closer to the cast pipe - right now is father and the cast pipe is connected to a plastic pipe that reach farther where the toilet currently is placed.
Many thanks!