I am losing my mind at the moment.
In October I started ripping out my living room with a view to plastering and decorating myself, and laying new laminate flooring.
There was wooden panelling on the one wall which I ripped off and I uncovered some pipes coming down the wall going into the old gas fire which has been disconnected for some time.
Also looking to get a new fire but realise this might not be possible before Christmas which is fine.
I had an appointment today to get the gas fire removed so I could at least sort that wall out for installation of a new one after Christmas. The called to cancel this morning. And rearranged for 29th Nov.
There is also a bit of wall jutting out one one side of the room from where the two rooms were knocked into one years ago.
I have always wanted this bit removed and realised this cannot be fine after the flooring is laid.
I've been trying to find a gas engineer and builder to sort the fire and wall so I can get on but it seems hopeless.
To top it all over im on holiday 8th to 18th December.
Is this doable or should I just give up?