....my DH thinks it will be disruptive and I will be distracted with it rather than focussing on them.....BUT it has taken months of planning and now ready to go but kids will be off during Easter and study leave......should I postpone until July?
Not extending - replacing like for like - but need to chase a wall to move position of electrics for oven, cut a new doorway (masonry) and dig a channel for water waste. I was thinking if I could get these noisy/dusty bits done before school holidays - then they would only have the noise of fitting the floating wood floor and installing the cabinets (carcasses already assembled)
Thoughts.....?