I recently had a 2m x 2m bathroom installed, but as work progressed, they uncovered rotten floor joists and a dodgy ceiling. So, they replaced the joists, re-laid the floor, and re-boarded the ceiling. They also built a 2m-wide, 2.8m-high stud wall.
Now I’ve been handed the bill, and some of the charges have me questioning everything:
-
10 plastic buckets – £18 (why so many?!)
-
28 HardieBacker sheets – £720 (seriously??)
- 420 HardieBacker screws – £140
-
Tile cutter – £70 (why am I buying their tools?)
- **Erbauer Multi-Material Holesaw – another tool I’m paying for??)
Am I being taken for a ride here, or is this normal?