Meet the Other Phone. A phone that grows with your child.

Meet the Other Phone.
A phone that grows with your child.

Buy now

Please or to access all these features

Property/DIY

Join our Property forum for renovation, DIY, and house selling advice.

1930s house told partial wiring needed...but worried about Artex ceilings

26 replies

Greenwitchhorse · 23/08/2023 06:35

I recently bought a new house, mid 1930s mid terrace house, and had an electrician come to have a look at the electrics before I move in

He initially said the circuits were fine after testing but suggested installing a new fuse box to bring things up to date.

Then at the last minute he noticed something after pulling out some of the cables that are attached to the fuse box and started opening wall sockets. Tt turns out that some of the sockets would need some earthing work. So he suggested a partial rewire of the house which will take a week. He quoted about £3000.

I was OK with that, but now on reflection I am now worrying about something else: the ceilings have some of that swirly designs on them and due to the house's age they could contain some asbestos. So I am concerned the work could disturb it.

The electrician made no mention of it as being a concern when he did the testing yesterday and talked about the work needed but I woke up in a cold sweat worrying about this possibility...

Has anyone had to deal with this type of issues?

I am planning on booking an asbestos survey at least and ask them for advice before doing any invasive work.

I wonder whether there are ways to do that rewire without disturbing/drilling the ceilings. (It is obvious some work has been done/would have happened on the electrics before over the years in the 80s and 90s...).

Any thoughts?

OP posts:
Greenwitchhorse · 31/08/2023 14:36

To update everyone I had the asbestos survey done.

All the artex ceilings came back negative thankfully.

The survey did find asbestos in a different pattern in the walls just in two old cupboards under the stairs, one where the electric board has been set up so I am looking at option to either have that removed or boarded.

At least it should be manageable financially as I really could not see myself take down every ceiling in the house...

OP posts:
New posts on this thread. Refresh page