Meet the Other Phone. Flexible and made to last.

Meet the Other Phone.
Flexible and made to last.

Buy now

Please or to access all these features

Property/DIY

Join our Property forum for renovation, DIY, and house selling advice.

Who is liable here?

27 replies

millefeuille2 · 02/11/2022 10:09

We had engineered wood flooring put in the kitchen last winter. Installation went well, though we noticed one area that warped slightly afterwards and pointed this out to the builders. They said this was fine as the floor was settling.

This area is warping badly now. I told the builders and they came round to take a look. Their diagnosis is that the humidity from the ground is making the floor bow, and their proposed solution is to increase the allowance (currently 1cm) at one end of the room. This will involve taking up some skirting, cutting one plank, fitting a threshold - 2 guys, 1 day's work they said.

The question is, should we be paying for this? The flooring company says if the flooring is warped, it will be because the floor underneath wasn't properly prepared. The planks are good quality, no-one disagrees with that. The builders haven't yet told me a price, but I think they are expecting to be paid for this.

I just wanted to check if this is appropriate, or if I should be requesting this work for free/reduced rate, or following up with the flooring company, etc.

Thank you!

OP posts:
millefeuille2 · 04/11/2022 07:27

But it's been raining a lot, so that water coming in and making the cavity more humid makes sense doesn't it?

OP posts:
C4tastrophe · 04/11/2022 11:32

Not really, the floor space should be very dry.
Maybe see if they can remove a plank and drill a big hole to see what’s going on? Or just slide one along to allow space.

New posts on this thread. Refresh page
Swipe left for the next trending thread