In brief, we need to sort out the following issues if we are going to stay in this house. 1890s end terrace.
Damp issues downstairs - had specialist company out before lockdown who started with new air bricks and will come back and advise on further work.
Evidence of possible subsidence - dropped floorboards in hall, twist in wallpaper in corner of back bedroom.
New kitchen needed, including floorboards as leak from old fridge rotted them. Temp boarded over so stable for now.
New bathroom. Room for complete remodel with separate shower cubicle.
Obviously, the possible subsidence is the priority. But do we go for separate trades to fix the separate things or get a full survey like we would if we were considering buying a house with a lot of issues?
We may be able to move out and get the whole thing done at once, but how would we go about that? RICS surveyor then find a builder that could take on the project?