We are having an extension built and had it designed by an architect. The family bathroom has been ripped out as a result and a partition wall inserted. I have ordered the kit for the bathroom based on the architect's design and the first fix of plumbing and electric happened yesterday. BUT.......
My mum came over yesterday and had a better idea for the layout. It means that three units I have ordered are not required and results in a towel rad having to be moved. Fortunately the pipes for the basins and soil stack would not move much and would be behind the cabinets.
I have not spoken to the bathroom supplier to know if they would refund me the surplus cabinets or the plumber to know about moving the rad but WWYD? Do I stick with the original design or make the changes now before if it all tiled? I am tearing my hair out (and 7 months pregnant with my 3rd). Please help, my DH is no help at all.