We had a builder out to build a playground which they have done well but where they have anchored and cemented in to the ground the park is 'floating' on the anchors and not level with the ground. We are putting play bark in so could just fill up to that level but there is a picnic table and a sandpit that are supposed to be built into the bottom of the frame and can't be now it's floating.
It's cemented into the ground. I don't really know if anything can be done about it. I'm just a little worried as the park was very expensive and I want all features to be usable rather than made redundant?