Hiphipho · 01/07/2020 16:26

Has anyone done a double storey extension in two stages due to cost?
We need extra space downstairs plus extra bedroom but can’t afford £100k + in one go as would be remortgaging to finance it. So were thinking of doing rear kitchen extension first, then eventually building above once we can afford to.
I appreciate it would likely be more expensive overall with the roof etc..
Has anyone done it this way? And how much value did the single storey add?

OP posts:
Report
sianyb83 · 01/07/2020 16:47

I know someone who basically got everything to first fix for 50k, (was quoted 100k for 2 story extension inc kitchen)
So the upstairs was just a shell, but watertight.
3 years later they finished the upstairs...

Report
Hiphipho · 01/07/2020 16:52

Wow that’s cheap..how long ago was it? Think it would drive me mad looking at the unfinished rooms upstairs but I guess it would be good motivation to save!

OP posts:
Report
Hiphipho · 01/07/2020 16:56

After first fix (is that plastered finish?) there would be..electrics,kitchen/bathroom, flooring, tiling, decorating..am I missing anything else obvious to finish??

OP posts:
Report
worriedmama1980 · 01/07/2020 17:11

We looked into it and it was much more expensive broken into stages than doing it all at once. 100k for everything vs 70k for first stage (you need more expensive foundations and other things for something that will become double height) then something like 50k for second. We found the extra money which I appreciate isn't an option for everyone and cut back v much on finish- basically we got tbe double storey shell and did all painting flooring kitchen fitting etc ourselves to save as much money as possible.

Report
Hiphipho · 01/07/2020 17:40

Thanks for that, that’s what I feared. It does seem abit pointless paying for a roof/sky lights in extension bit to rip it off again too. When you say ‘shell’, what finish was it done to? How much did you budget to finish it all off yourself, if you don’t mind me asking?

OP posts:
Report
Africa2go · 02/07/2020 00:34

Similar situation in that we got permission for a double storey wraparound extension. Got quotes and couldn't afford to do it all, so just did a double storey rear extension. I can't remember the numbers exactly but it was something like £40k extra to go out at the side. 4yrs on and we've just got quotes for a single storey at the time, and its £40k just for the single storey at the side now.

Its really tough. I wouldn't have wanted to compromise on finishes / kitchen etc when we did the original extension so we just couldn't have done it. We really couldnt have found that much extra. However, i'm gutted that its going to cost so much more to do it in 2 stages (not even sure we'll go ahead).

Report
Rhica · 02/07/2020 01:27

We are doing ours in 2 stages. I wonder if the increase in prices in prev comments reflects more the increase in building costs over time rather than extra costs for doing it in 2 stages if that makes sense.

I told the builders our plans to extend again in the future so Our foundations and roof in the extension have been done ready to build on only additional/wasted costs incurred would be the roof finish and planning application. Maybe I'm being overly optimistic though

Advantages of doing it this way is reduced disruption. But then... Will be two lots of disruption so maybe that isn't a plus

Report
Hiphipho · 02/07/2020 06:11

Rhica - would you mind sharing what quotes you were given for the single storey recently and size?

OP posts:
Report
AbitObsessed · 02/07/2020 08:21

I'm just about to embark on a single story extension. We weren't sure about a double story and decided to just go with the single, however our plans and build will include steels in place if we ever want to add a room over one side of the extension. The price has come in a lot higher than expected for the single extension, but we decided to keep the steels. They cost an extra £800 or so, but would cost triple that to pit in place retrospectively. We may never build that extra room, but we have the option and it'll be a bonus if we ever sell.
I think building up would only have been less than 50% of the cost of doing the ground floor.
My advice, put the structural work in place now because it'll be more expensive and more disruptive than later.

On another note, we aren't putting skylights into the room below where we'd add the upstairs extension, but kept it above our kitchen only which could be impacted by a reduction in light from the upstairs room. Hope that helps

Report
weepingwillow22 · 02/07/2020 08:22

I don't think you will save that much doing just the ground floor first. The footings, roof and finishings are the expensive part, all you will save is an extra few couses of bricks and the upstairs windows.

If you can't afford to do it all I would either wait and save, compromise on the finishes or like others have said get the first floor watertight/to first fix and leave it to later.

Are you planning on adding a bathroom upstairs? If so this is where the upstairs cost will mount up. An additional bedroom is relatively inexpensive.

To give you an idea of costs we are currently doing a 2 storey, kitchen with bedroom above of 64m2. The total cost excluding the kitchen and flooring but including vat is £110k. If we just did the ground floor I think it would be about £80-90k. Our build has a lot of steels and glass and we are in the SE so you could get it cheaper than this.

Report
twoglassesofprosecco · 02/07/2020 08:31

We're doing it in two stages. We did the single storey ground floor kitchen extension five years ago with a view to adding a large en-suite bedroom above. Awaiting planning for the upper floor now.
Kitchen cost £30k including foundations to take a second floor, downstairs loo that has pipe work to go upstairs to en-suite, and the roof of the kitchen will be repurposed above the bedroom, plus the kitchen roof joists are suitable to be a floor for the bedroom.

It's a shame we couldn't do it all at once, but money...

Report
Baxdream · 02/07/2020 08:39

We did a large double storey 3 years ago. We did it in one go.
Could you do it as a shell upstairs and leave it?
We remortgaged twice during it. We got the initial money then got the house valued once the downstairs was done and got more out to finish it. You could do that?

Report
Rhica · 02/07/2020 10:29

@Hiphipho are quoted were 47k, 53k and 79k for a 7m x3m extension. That's wall in (ie finished with kitchen and decorated)

We actually went bigger with a 10m x 3m plus half garage conversion. This was far more complex and required huge steels as we removed the corner of the house. Our quotes were 53k and 69k.

We are finishing in the next week and will end up spending 65k. Mostly due to upgraded kitchen and 4k for additional roof costs.

Report
Hiphipho · 02/07/2020 10:38

Baxdream, how much value did the finished downstairs add for you? I think that’s a good idea actually, hopefully doing it that way it won’t be unfinished for too long.
Really don’t want to compromise on the kitchen extension, although won’t go mad with the spec it’s probably a once in a lifetime thing for us to have it exactly how we want it do don’t want to scrimp and regret anything!
Are you happy with how yours ended up?

OP posts:
Report
Hiphipho · 02/07/2020 10:43

Rhica - what part of the country are you in? Your quotes have given me hope actually!

OP posts:
Report
Loofah01 · 02/07/2020 10:55

Yep, me! Wen't to architect and asked for plans with budget of 150-200k. Lovely plans, great in all respects but one - the actually quotes were double expected. Made some changes but still having to do in two build phases. The plus side is the learning from first phase!
We made sure that we spent extra in phase 1 to make sure phase 2 would be simpler - added pads for the steels and put in some steels now instead of later.
Phase 1 has probably added what we spent, phase 2 will add about 3 times the spend.
Because each builder has a different idea of finish, I'd suggest getting quotes for build up to 1st fix (walls n shit), and the 2nd fix just cost for fitting based on what you supply. It means you spec the bathroom, kitchen, floor covering, doors and fixing etc but there's no interpretation required - you get what you expect, not the builders liberal interpretation of a high end finish which is a basic spec from Wickes.

Report
Hiphipho · 02/07/2020 11:05

Great tip about second fix fitting only thanks!
How much on average should drawings/plans cost??

OP posts:
Report
Rhica · 02/07/2020 11:37

Based in Chester. The quotes were for lower spec. Think laminate floors and 4k kitchen. I went for this to eliminate mis-interpretations as @Loofah01 has mentioned above.

We took a gamble and went for the cheaper builder. His work has been spot on

Report
tentative3 · 02/07/2020 20:47

Rhica if you would recommend the builder would you mind pm'ing me his details?

Report
Tubbyinthehottub · 02/07/2020 20:58

Yes, we converted the garage and had another garage built on the side. Then a few years later built on top of the 'garages' and also did a kitchen extension. It was more expensive but that's how it happened. No idea about value but it was worth it for us to have the living space we wanted.

Report
Georgielovespie · 02/07/2020 21:37

You are only saving the cost of the second storey walls and a window so I would look at getting more quotes to do it all in one go. You already have single storey walls and the cost of the roof so how can it cost so much more?

Our builder charged us a daily rate but told us how long it would take and was true to his word. He rang the builders' merchant and we paid them directly, same with all the sub-contractors, plasterer, windows people but all of that was covered in the original quote so we knew what we would be paying and to whom.

It meant he was under the VAT threshold every year as he only charged for his labour, no other money went through him. He invoiced me every week after he had worked the 5 days and then I did a bank transfer whilst he was having a final cup of tea for the day. He is no longer doing building work so I can't even recommend him to anyone.

Source your own kitchen and get them to fit it, that is what we did. I shopped around for everything appliances, worktop etc etc to cut costs wherever I could.

Report
Baxdream · 02/07/2020 23:17

We were really happy with it. Ours was £120k all in including kitchen etc. Ours was large about 7m by 5m double storey. Ours was probably worth 330k pre build and it's now £485k

Report

Don’t want to miss threads like this?

Weekly

Sign up to our weekly round up and get all the best threads sent straight to your inbox!

Log in to update your newsletter preferences.

You've subscribed!

mumdone · 03/07/2020 06:20

@Baxdream this is exactly what we are doing. As lenders are loaning large LTV so the price needs to go up!

Report
Baxdream · 03/07/2020 08:37

You just have to make sure you do the big parts that add the value first and don't make it unmortgagable ie make sure the new kitchen is in and plaster etc
Plus have a great mortgage broker

Report
worriedmama1980 · 06/07/2020 10:32

To answer the q about finish, 'shell'is probably overstating it: we had plastered walls, windows installed, electrics (plugs, lights) fitted (they came back and did whatever was needed to hook up oven after we installed kitchen) and a concrete floor with whatever you pour over underfloor heating. What we did was: plan and fit kitchen from IKEA, cost around 6k including appliances, really recommend not doing this if you have money as it took a week. Laid flooring, did painting, put in skirting boards.

I have no idea of total cost as a lot of it we were paying out of monthly salary as it came in by that point, I'd say less than 10k for kitchen and flooring and paint, we had help from family carrying out the work and it took months to get things finished. Still haven't finished upstairs bedroom: have to paint and carpet.

Incredibly glad we did it all at once as the level of disruption was huge and couldn't face doing it again.