Just fallen off my perch at a quote of £8k! I am in the SE but still; all we want is
-10 base cabinets and 10 wall cabinets plus 2 integrated appliances
- Remove but not replace and floor tiles in kitchen
- No worktops to fit as these will be done separately
- Replace existing shower cubicle, tiles, toilet and basin
- bit of electrical work to intstall cooker, move a couple of sockets, replace lights etc
This is labour only, we'll be supplying all materials.
Is this bonkers or am I massively underestimating how much this should cost?
Also how long would you think it would take?